Most supplier comparisons are decided by presentation. The company with the better deck, the faster reply and the more confident answer wins the shortlist, and then the project spends eighteen months finding out what was actually behind it. This page is about replacing that with checks that cost a few days and settle the question properly.
Before comparing quotes, work through the hotel furniture sourcing guide, then line the pieces up with everything we make so nothing is missing at the factory stage.
It assumes the scope is already fixed. If it is not, fix that first on hotel furniture scope by room - comparing suppliers against an unsettled scope just ranks how each one guessed.
Underneath the presentation there are only four questions, and each one can be answered with something you can look at.
| Claim | Check |
|---|---|
| "We have done many five-star hotels" | Two references in your category, with the room count, the year and a contact who answers |
| "We can manufacture to any drawing" | Send one difficult drawing and ask for marked-up comments back in three days |
| "Our materials meet the standard" | Ask for the mill or laboratory report for the exact fabric, foam or board, with the colourway named |
| "Our QC is strict" | Ask for the last inspection report from a hotel shipment, including the defect list |
| "Capacity is not a problem" | Ask which lines will run your order, and when, against a calendar you can see |
| "Delivery is 45 days" | Ask what the 45 days excludes - sample approval, material lead time, inspection, or the shipping window |
Three rules make a comparison defensible. First, normalise the specification before scoring: if two suppliers priced different scopes, convert both to the same item list before any number is compared, and record what was added or removed. Second, weight the things that are hard to fix later - capability, evidence and capacity - above price, because price is the only variable that can still be negotiated after award. Third, score the exclusion list as part of the offer, not as a footnote.
The mechanics of scoring responses fairly, including how to strip scope differences out of a comparison, are on scoring supplier responses. The qualification checklist for the shortlist stage sits on the supplier qualification checklist.
Once the supplier is chosen, the contract stage - payment structure, warranty, phase plan - is on how to run the RFQ and compare responses. If the project is a guestroom package specifically, the room-by-room guestroom package sets out what the factory has to be able to repeat.
Three is usually enough to test the market and few enough to evaluate properly. More than four turns into a paper exercise where nobody's evidence is actually checked.
No, but it should be interrogated. A materially lower price is either a smaller scope, a lighter construction, or a supplier buying the work. The first two are visible on comparison; the third shows up as a change order later.
The references, because they are harder to stage and they tell you what happened after delivery. A factory visit confirms capacity and organisation; references confirm behaviour under a real project schedule.
See the whole catalogue in Everything We Make.