Furniture Centre
Shop New / Luxury Automotive-Style Bed Alternative Guide
Shop New / Custom Italian Leather Sofas
Shop New / Custom Living Room FurnitureA recess decides more than a drawing does: the depth of the alcove, the skirting under it and the socket inside it fix what will fit. We build custom casegoods to that recess, and the casegoods range is drawn from the opening, not a size list.
An order is usually a run of cabinets, a wardrobe and a wall unit, and the casegoods manufacturers guide sets out what to ask first. Casegoods furniture here is specified room by room.
What stays fixed is the method: carcass, doors, interior and finish are drawn on one sheet, and a bespoke casegoods run is signed off before a panel is cut.
What changes is the filler, the plinth and the top: an out-of-square wall takes a scribed filler. Custom casegoods cabinets are usually one run in a bedroom and one in a study.
Production is 45-60 days from approved drawings.
The interior is where a cabinet earns its place, and the layout is decided before the carcass rather than after it, because the layout is what the quotation is built from and what the fitter works to.
A hanging section needs the longest garment plus a hand's width above the rail; shelving needs the tallest object plus a shelf thickness; a drawer bank needs the runner length plus clearance at the back. Guest room casegoods usually combine all three in one run, which is why the layout is drawn as an elevation rather than written as a list, and why the rail height is fixed before the doors are ordered.
Adjustable shelves sit on pins in a drilled line, and the line is set on the drawing so a later shelf can be added without a new carcass. The pin line is usually drilled at 32 mm centres, which is the spacing the system hardware is made to. A minibar cabinet is a niche with a shelf, a socket and a light, and it is the detail that most often arrives late on a project because nobody measured the bottle height.
A wardrobe interior is a sequence rather than a set of boxes: long hanging first, then short hanging over drawers, then shelves at the end that is least reached. A hotel casegoods range is normally drawn with a minibar niche and a safe box, and the hotel casegoods guide covers how those two are placed in a room type.
A hand-drawn elevation with the rail heights and the shelf spacing is enough to start; a photograph of the clothes rail in the old cabinet is better than a description. If the recess is shallow, the hanging moves to the wardrobe and the run is drawn as shelving and drawers only, which is the usual answer for a guest room.
A carcass is a box that has to fit a hole, and the hole is never quite square, so the drawing starts with the measurements rather than with the cabinet.
Measure the recess at the top, the middle and the bottom, and at both ends; the narrowest number is the one the carcass is made to, and it is written on the drawing beside the widest so the filler allowance is visible. The skirting sets the plinth, and a skirting that continues behind the cabinet either needs a cut-out or wants the cabinet set forward on a visible plinth that is detailed on the elevation.
A filler is a scribed strip that takes up the difference between a straight cabinet and a bent wall; it is drawn as part of the run so the gap reads as a design line rather than a mistake. Filler width follows the out-of-square measurement rather than a standard trim, which is why the three measurements are taken before the filler is specified.
Sockets inside a recess are either kept clear by the back panel or brought forward into the cabinet as a service void. Vents and cable runs are drawn at the same time, because a hole cut after finishing is a chip waiting to happen, and a socket that lands behind a drawer bank is moved rather than blocked.
Send the plan, the recess elevations, the socket positions, the skirting and cornice heights, and the ceiling height. A recess with a radiator under the sill needs the run broken rather than boxed around it, which is a drawing decision rather than a site one. The table below is the tolerance the run is made to.
| Part | Residential work | Contract work |
|---|---|---|
| Assembled carcass and plinth | ±2 mm | ±3 mm |
| Door and drawer reveals | ±2 mm | ±3 mm |
| Carcass to recess and skirting | ±2 mm | ±3 mm |
Alignment is what a client sees first and what a fitter argues about last, so it is written as a number rather than left to a preference on the day, and the number is checked with a feeler gauge rather than by eye.
A reveal is the gap between a door and the carcass, and it is set by the hinge rather than by eye: a consistent reveal across a run reads as one plane, and a wider gap in one place reads as a mistake. The reveal is the same at the top, the bottom and the hinge side, and it is checked on the hung door rather than on a bench, because a door that looks right on a trestle closes differently on a carcass.
Doors are hung, swung and adjusted before packing; drawer fronts are set to the same line as the doors above them. A wardrobe casegoods run with four doors is aligned as one plane rather than as four separate doors, and a door that will not sit is re-hung rather than packed with a note.
The tolerance is written into the order: assembled parts at ±2 mm for residential work and ±3 mm for contract work. It is quoted rather than implied, so the inspection sheet and the drawing agree before the first panel is cut.
A cabinet is read at the door, so the species, the veneer and the handle are the three decisions that carry the whole run, and the three are decided against the floor and the light rather than against a photograph. The three are recorded on the drawing.
Visible solid timber is named by species: ash, beech, oak, birch, walnut and elm, each written on the drawing with the part it belongs to. A wood casegoods run in oak reads cooler than walnut, and the choice is usually made against the floor, because the cabinet is one of the few pieces a hand touches at the door rather than at the top.
Veneer is a slice of timber over a board, and the joint pattern is what makes a run read as one panel: a book-matched door pair is drawn as a pair, and the flitch is kept for the run so a later door can be cut from the same slice. A veneer casegoods run is specified by slice and by matching, and the italian casegoods language is carried by proportion and by the figure of the veneer rather than by a named model.
Hinges, runners, handles and locks come from named partners or an approved equivalent named on the drawing, so a substitution is visible rather than silent. The Italian-style luxury furniture range is drawn from the same species, veneer and hardware schedule, and a replacement part can be matched years later.
Non-visible parts take Russian pine and domestic mixed wood, and boards are E1 grade; naming a species is a specification, not a stock promise. The grade covers everything a hand never reaches, and it is written on the drawing for that reason.
| Element | What is specified | What is written on the drawing |
|---|---|---|
| Visible solid timber | ash, beech, oak, birch, walnut, elm | species, part, grain direction |
| Veneer | slice and joint pattern | veneer reference, matched panels |
| Non-visible parts | Russian pine, domestic mixed wood | board grade E1 |
| Hardware | named partner or approved equivalent | hinge, runner, handle, lock |
A run of doors is the hardest surface to finish consistently, because every panel is compared with the one beside it, and the comparison is made at an angle rather than straight on, and under a raking light.
Lacquer is a film finish over a sealed surface; a painted finish is opaque, and a veneer is read through a clear coat. A lacquer casegoods run can be matte or satin, and the sheen is specified as precisely as the colour, because two sheens in one room read as two colours even when the pigment is identical.
Doors and drawer fronts come off one batch, and side panels are finished with the same schedule; a modern casegoods scheme usually keeps the carcass and the doors in one colour, while a minimalist casegoods scheme removes the handle line instead. The luxury interior design language a studio works to is the reference we draw against, and it is what the approval is signed against.
Batch variation is agreed in writing before production; a colour matching system can be described by a supplier, and what a buyer controls is the finish approval and the written record of variation between batches, not the supplier's internal numbering.
What cannot be promised is that a natural veneer will read the same under a different light, or that two panels cut from different flitches will be indistinguishable. That is why the sample is judged in the room rather than in the workshop, and why the sheen is written down.
The order runs from a measured recess to a signed drawing, and each step has an output the buyer can check, which is what keeps a six-week build from becoming a six-month argument.
A made to order casegoods quotation is built from the recess measurements, the interior layout and the finish schedule; each run is quoted as its own drawing, and nothing is quoted from a photograph, because the recess behind the photograph is not the recess you have. A request without measurements is answered with a question rather than a figure, and the question is usually about the depth.
The quotation covers the carcass, the doors and drawer fronts, the interior fittings, the hardware, the sample and the packing. What it does not cover is written beside it: freight, duty and destination charges are quoted separately, site work is not part of the order, and a written list of exclusions travels with every quotation so two offers can be compared like for like, and the exclusions are the part most often skipped.
A deposit holds a production slot, and the slot is counted from the approved drawing rather than from the enquiry. Production is 45-60 days from that approval. The sourcing guide for made-to-order furniture covers the questions worth asking before the drawing stage, and most of them are about the recess.
A sample is a physical decision, and on a cabinet the door is the piece that carries the decision, because the door is what the room is read against.
The sample settles the material, the finish, the reveal and the colour on a door-sized panel judged under the room's own light. For a veneer run it also settles the joint pattern, because a book-matched pair and a slip-matched pair read differently at the seam.
Approval is a signature against the sample and the drawing. Sampling is not free. The sample charge is deducted from the bulk order. Until the signature exists the batch is not released and the production clock has not started. Where a project needs a China-side partner to hold the sample and the approvals, working with a China-side partner sets out the split.
What cannot be guaranteed is how a surface will age, or how a veneer will read in a different light. A change after the sample is a new sample rather than a note on the drawing, and it moves the approval date rather than the delivery date.
Photographs of approved samples and the signed record are pending in the asset library.
A cabinet is inspected twice, because a carcass that is out of square can be corrected in white body and cannot be corrected after finishing, and the same fault costs more at each stage.
Every carcass is inspected in white body: joints, square, level, the plinth and the fixing points. A casegoods manufacturer that inspects only the finished face is inspecting the wrong side of the piece. A carcass corrected here arrives square, and the correction is recorded against the drawing number.
The finished run is inspected against the drawing and the approved sample: reveal line, veneer matching, finish coverage and hardware fit. Photographs before packing become the record for that unit, taken from the front, both sides and from above.
Rejected: cracks, exposed pins, sanding distortion, visible repair marks, spray marks, chipped edges, runs and lifted veneer. Hinges are swung and runners cycled before the crate is closed, and a door that will not sit on the reveal line is re-hung rather than packed with a note. furniture sourcing and inspection sets out the questions worth asking of any supplier, and inspection here can take three forms: third-party inspection arranged on request, customer inspection, and video inspection.
Four layers by product type: a soft wrap against the finish, foam at the corners, a carton, and a timber frame for the tall pieces and anything with glass. The table below sets out what each type gets.
| Product type | Layer 1 | Layer 2 | Layer 3 | Layer 4 |
|---|---|---|---|---|
| Carcass and doors | soft wrap | corner foam | carton | timber frame |
| Drawer banks | soft wrap | edge foam | carton | strapped carton |
| Glass and mirror | soft wrap | crate insert | carton | timber crate |
Most of our casegoods go into private residences, and the project work is the same drawing discipline at a larger count, with the same drawings and the same inspection rounds.
In a villa the runs are drawn inside a whole-villa furniture supply package, so the joinery in the study and the run in the bedroom share one finish schedule.
A show flat is specified for the camera: the reveal line, the handle and the sheen matter more than the inside of a drawer.
Hospitality casegoods add a minibar niche, a safe box and a repeat count. A hotel case goods run is drawn per room type rather than per room, so a custom hotel casegoods order repeats one drawing across a floor, and a custom hospitality casegoods order is quoted per project. As a hospitality casegoods supplier we describe the process rather than a client list; a hotel casegoods supplier and a casegoods supplier are judged on the same inspection sheet, and the same custom hotel furniture process applies to any hotel furniture manufacturer running it. hospitality furniture programmes covers that work.
A cabinet is read against the rest of the room, so the run is drawn with the pieces it will sit beside, and the top line is usually set by the tallest piece rather than by the cabinet itself, and that line is set on the elevation before any panel is ordered.
A wall unit, a wardrobe and a cabinet in one room share a top line and a reveal; the beds and headboards set the height of the bedside, the bedroom furniture sets and the nightstands follow it, and the side tables take the lamp.
The coffee tables, dining tables and leather sofas in the rooms next door are usually drawn from the same schedule when the whole house is fitted out, which is why the joinery is scheduled before the loose furniture is ordered, so the joinery is drawn last rather than first.
Before the drawing, the room needs its floor level, its socket positions, its ceiling height and a decision on the door swing; without those four the run is a sketch rather than a drawing, and every later change moves a panel that has already been cut.
Hanging, shelving, drawer banks, a minibar niche and a safe box, drawn as an elevation with rail heights and shelf spacing so a later shelf can be added without a new carcass.
The recess is measured at the top, middle and bottom and at both ends; the narrowest number is the one the carcass is made to, with a scribed filler taking up the out-of-square.
Assembled parts at plus or minus 2 mm for residential work and plus or minus 3 mm for contract work, written into the order so the drawing and the inspection sheet agree.
Ash, beech, oak, birch, walnut and elm, with veneer where the run needs a matched figure. Hinges, runners, handles and locks come from named partners or an approved equivalent.
On a door-sized sample judged in the room's light and signed against the drawing, with batch variation agreed in writing before production.
Per project, from the recess measurements, the interior layout and the finish schedule. The quotation covers the carcass, the fronts, the fittings, the hardware, the sample and the packing.
45-60 days from the approved drawing, counted from signature; inspection and the shipment booking sit inside that window.
In white body first, then finished; four layers by product type with a timber frame for tall pieces and glass, and a packing list that travels with the goods.
For the wider picture, categories, buying stages and buyer types are set out in everything we make.
tags: custom casegoods, cabinets, made to order
+8613433290964
No. 9, Longfeng Industrial Zone, Longjiang Town, Shunde District, Foshan City, Guangdong 528300, China